Controlled-products-systems-group 3265-267H Manual do Utilizador Página 10

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 72
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 9
Header Bracket
Chain Pulley
Bracket
Temporary
Support
Header Wall
Garage
Door
Rail
Clevis Pin
5/16"x2-3/4"
Ring Fastener
Header Bracket
Chain
Pulley
Bracket
Rail
10
Clevis Pin
5/16"x2-3/4"
Ring Fastener
INSTALLATION STEP 3
Attach the Rail to the Header Bracket
Position the opener on the garage floor below the
header bracket. Use packing material as a protective
base. NOTE: If the door spring is in the way you’ll need
help. Have someone hold the opener securely on a
temporary support to allow the rail to clear the spring.
Position the rail bracket against the header bracket.
Align the bracket holes and join with a clevis pin
as shown.
Insert a ring fastener to secure.
HARDWARE SHOWN ACTUAL SIZE
Vista de página 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 71 72

Comentários a estes Manuais

Sem comentários